Construction Procedure Directives (CPDs)
List of Eliminated Construction Procedure Directives
| CPD11-5 | Construction General Permit Training [pdf] | 12/28/2011 | |
| CPD11-4 | Smoothness Specification Requirements for Thin Hot Mix Asphalt Overlays [pdf] | 10/28/2011 | |
| CPD11-3 | Use of the California Highway Patrol in Construction Work Zones [pdf] | 08/24/2011 | |
| CPD11-2 | Grandfathered Risk Level 1 Projects [pdf] | 07/22/2011 | |
| CPD11-1 | ADA Requirements for Temporary Pedestrian Facilities [pdf] | 04/05/2011 | Temporary Pedestrian Facilities Handbook |
| CPD10-14 | Relative Mortar Strength of Fine Aggregate [pdf] | 11/30/2010 | |
| CPD10-13 | Revised Implementation of Traffic Operations Policy Directive 09-06 [pdf] | 10/28/2010 | |
| CPD10-12 | Interviews with Contractor Personnel [pdf] | 09/09/2010 | |
| CPD10-11 | 2010 Code of Safe Practices [pdf] | 08/26/2010 | |
| CPD10-10 | Shortage of Material--Pavement Striping and Markings [pdf] | 07/30/2010 | |
| CPD10-9 | Implementation of New Construction General Permit Risk Levels 2 and 3 [pdf] | 07/30/2010 | |
| CPD10-8 | Stem to Deck Construction Joint [pdf] | 08/12/2010 | |
| CPD10-7 | Supplemental G-12 Funds Request Memorandum-Signature Change [pdf] | 07/16/2010 | |
| CPD10-6 | Small Business Utilization Report Pilot Program Cancellation [pdf] | 06/30/2010 | |
| CPD10-5 | Adding Water to Concrete in the Field [pdf] | 06/24/2010 | |
| CPD10-4 | Implementation of New Construction General Permit [pdf] | 05/24/2010 | |
| CPD10-3 | Major Incident Notification [pdf] | 04/22/2010 | |
| CPD10-2 | Consistent Implementation of Caltrans Stormwater Management Program [pdf] | 03/09/2010 | |
| CPD10-1 | Small Business Utilization Report Pilot Program Extension [pdf] | 02/25/2010 | |
| CPD 09-14 | Resident Engineer Daily Reports and Monthly Pay Quantity Verification [pdf] | 12/30/2009 | |
| CPD 09-13 | Variance for Aerially Deposited Lead [pdf] | 10/23/2009 | |
| CPD 09-12 | Implementation of Traffic Operations [pdf] | 10/15/2009 | |
| CPD 09-11 | Equipment Rental Rates Effective October 1, 2009 [pdf] | 09/28/2009 | |
| CPD 09-10 | Supplemental Progress Payment Estimates [pdf] | 08/25/2009 | |
| CPD 09-9 | Charges for Restaking Rate [pdf] | 08/13/2009 | |
| CPD 09-8 | Recovery Act Reporting [pdf] | 08/03/2009 | |
| CPD 09-7 | Federal Segregation Determination on Contract Change Order [pdf] | 07/28/2009 | |
| CPD 09-6 | High-Visibility Garment Standards [pdf] | 05/29/2009 | |
| CPD 09-5 | Five Percent Limestone in Portland Cement [pdf] | 05/27/2009 | |
| CPD 09-4 | Use of "SLOW FOR THE CONE ZONE" SC20(CA) Sign in Construction Projects [pdf] | 04/10/2009 | |
| CPD 09-3 | Small Business Utilization Report [pdf] | 04/10/2009 | |
| CPD 09-2 | Temporary Sales and Use Tax Increase -Assembly Bill 3 (Evans)[pdf] | 04/02/2009 | |
| CPD 09-1 | District Director Determination of Claims (Evans)[pdf] | 03/26/2009 |
Attachment 1 - Sample Certified Mail - Return Receipt Requested PDF Version Word Version
|
| CPD 08-13 | Accessible Parking Implementation-Assembly Bill 1531 [pdf] | 12/05/2008 | |
| CPD 08-11 | Construction Claims Information System [pdf] | 10/21/2008 | |
| CPD 08-9 | Hot Mix Asphalt Specifications Evaluation [pdf] | 09/29/08 | |
| CPD 08-8 | Worker Certification Requirements [pdf] | 09/11/2008 | |
| CPD 08-7 | Options for Meeting California Test 371 Requirements for Rubberized Hot Mix Asphalt-Gap Graded [pdf] |
09/18/2008 | |
| CPD 08-6 | Cost Reduction Incentive Proposals [pdf] | 08/29/2008 | |
| CPD 08-5 | Quality Management Work on the State Highway System [pdf] | 08/20/2008 |
Attach 1: Source Inspection Quality Management Plan for Local Agency [pdf]
Attach 2: Local Agency's Quality Management Plan for Construction Phase [pdf] Attachment 3: Construction Manual Supplement for Local Agency Resident Engineers [pdf] Attachment 4: Local Agency Structure Representative Guidelines [pdf] |
| CPD 08-4 | 2009 Time Extension on Existing Variance for Aerially Deposited Lead [pdf] | 07/28/2008 | |
| CPD 08-3 | Equipment Rental Rates Effective August 1, 2008 [pdf] | 07/28/2008 | |
| CPD 08-2 | Pavement Asphalt Concrete Reporting System [pdf] | 06/25/2008 |
Attach 1 SAMPLE: Contract Change Order Memo-Use of AcPay3 [pdf]
Attach 2 SAMPLE: Contract Change Order-Use of AcPay3 [pdf] Attachment 3 SAMPLE: Contract Change Order Memo-Use of HMAPay [pdf] Attachment 4 SAMPLE: Contract Change Order-Use of HMAPay [doc] Attachment 5 FHWA-Record of Blanket Prior Approval for Major Contract Change Order [pdf] |
| CPD 08-1 | Day After Thanksgiving - Nonworking Day [pdf] | 02/29/2008 | |
| CPD 07-4 | 2008 Time Extension on Existing Variance for Aerially Deposited Lead [pdf] | 08/20/2007 | |
| CPD 07-2 | Portland Cement Specification [pdf] | 02/23/2007 | FHWA Blanket approval [pdf] Sample CCO Memo [pdf] Sample CCO [pdf] |
| CPD 06-11 | Performance Graded Polymer Modified Asphalt [pdf] | 11/21/2006 | Attachment 1 [pdf] Attachment 2 [pdf] Attachment 3 CCO Memo [pdf] Attachment 3 CCO Memo [doc] Attachment 4 [pdf] Attachment 4 [doc] Attachment 5[pdf] |
| CPD 06-10 | Office of Administrative Hearings' Change of Address [pdf] | 10/06/2006 | Attachment [pdf] Supersedes CPD 05-9 |
| CPD 06-9 | Change in Flare Gap in Flared Columns [pdf] | 09/21/2006 | Attachment 1 Sample CCO Memo form CEM-4903 [pdf] Attachment 2 Sample CCO Form CEM-4900 [pdf] |
| CPD 06-7 | Eliminate haunch detail for Type 1 Retaining Walls with safety barrier [pdf] | 08/24/2006 | DES Memo [pdf] FHWA Blanket Approval[pdf] Sample CCO Eliminate Haunch [pdf] Sample CCO Memo[pdf] CEM 4903 Word Copy [doc] |
| CPD 06-5 | Disadvantaged Business Enterprise Program [pdf] | 05/06/2006 | Superseded by CPB 09-3 |
| CPD 06-4 | Revised - Seed Samples for Erosion Control Work [pdf] | 04/18/2006 | Attachment [pdf] Superseded by CPD 07-3 |
| CPD 06-3 | Division of Construction Approved Contract Change Order Direction [pdf] | 04/05/2006 | Attachment [pdf] |
| CPD 06-2 | Serving Legal Division with a Copy of a Contract Complaint in Arbitration [pdf] | 02/17/2006 | Attachment [pdf] Attachment [doc] |
| CPD 05-13 | Effects of Assembly Bill 574, Recycled Concrete [pdf] | 12/29/2005 | |
| CPD 05-10 | Performance Graded Paving Asphalt [pdf] | 11/10//2005 | Attachment 1 [pdf] Attachment 2 [pdf] Attachment 3 [pdf] Attachment 4 [pdf] |
| CPD 05-8 | Availability of Storm Water Pollution Prevention Documents to State Agencies and Public [pdf] | 08/26/2005 | |
| CPD 05-6 | Construction's Role in the Development of the Division of Design's Storm Water Data Report [pdf] | 07/28/2005 | |
| CPD 05-5 | Construction Policy Directive 05-5 Expiration of the Variance for Aerially Deposited Lead [pdf] | 05/11/2005 | Superseded by CPD 06-6 Attachment 1 [pdf] |
| CPD 05-4 | Rescind CPD 03-8 (Reinforcing Steel Shortage) [pdf] | 04/27/2005 | |
| CPD 05-2 | Inconsequential Contract Change Order Determinations [pdf] | 04/20/2005 | |
| CPD 04-6 | Application of the Tunnel Safety Orders [pdf] | 05/10/2004 | Attachment 1 [pdf] |
| CPD 04-4 | Ultimate and Service Butt Splice Production Tests for Reinforcing Steel, Revised Witnessing Requirements [pdf] | 07/06/2004 | Attachment 1[pdf] Sample CCO[pdf] Sample CCO Memo[pdf] FHWA Blanket Approval[pdf] |
| CPD 04-3 | Distribution of Claim Documents [pdf] | 02/23/2004 | Attachment 1 [pdf] |
| CPD 04-2 | Disposition of Construction Project Records [pdf] | 04/06/2004 | |
| CPD 04-1 | Contractor Licensing [pdf] | 04/15/2004 | Attachment 1[pdf] Attachment 2[pdf] |
| CPD 03-4 | Pile Driving Acceptance Criteria [pdf] | 09/02/2003 | |
| CPD 02-7 | Water Pollution Control Inspections for Off-site Contractor Activities [pdf] | 9/23/2002 | |
| CPD 02-5 | Traffic Signal And Lighting Poles [pdf] | 4/22/2002 | Attachment 1 [pdf] Attachment 2[pdf] |
| CPD 02-4 | Hazardous Materials Internet Information [pdf] | 3/12/2002 | |
| CPD 02-3 | Damage Claim Standard Special Provisions (SSP) Revision [pdf] | 8/23/2002 | |
| CPD 01-15 | Overhead Sign Structures [pdf] | 11/15/2001 | Attachment 1 [pdf] Attachment 2[pdf] |
| CPD 01-14[pdf] | Quality of Traffic Control Devices [pdf] | 11/29/2001 | |
| CPD 01-11 | Hostin Operations near Public Traffic and Pedestrians [pdf] | 9/17/2001 | Attachment 1 [pdf] Attachment 2 [pdf] |
| CPD 01-06 | Unsatisfactory Progress of Work [pdf] | 7/13/2001 | - |
| CPD 01-05 | Energy Crisis Contingency Planning [pdf] | 7/2/2001 | - |
| CPD 01-04 | Respirator Work during Rubberized Asphalt Concrete (RAC) and Performance Bond Asphalt (PBA) Paving [pdf] | 7/3/2001 | - |
| CPD 01-02 | Industrial Work Order 16 and Assembly Bill 60 [pdf] | 2/28/2001 | - |
| CPD 01-01 | Construction Contract Time [pdf] | 2/28/2001 | - |
| CPD 00-13 | Revised SSP S5-170, "Dispute Review Board" [pdf] New SSP S5-056, "Final Payment and Claims" |
12/12/2000 | SSP S5-170 [pdf] SSP S5-056 [pdf] |
| CPD 00-11 | Overtime Policy for Construction Employees [pdf] | 9/27/2000 | General Guidelines [pdf] |
| CPD 00-10 | Contractor Contingency Plans [pdf] | 8/22/2000 | _ |
| CPD 00-9 | Processing Claim Settlement Reports [pdf] | 10/27/00 | Delegation Table [pdf] |
| CPD 00-8.1 | Addendum, Aerially Deposited Lead Variance [pdf] | 9/20/2000 | Attachment[pdf] |
| CPD 00-5 | Clarifications to Differing Site Conditions Specifications [pdf] | 5/23/00 | _ |
| CPD 00-3 | Caltrans Test 360 - Surface Abrasion [pdf] | 5/11/00 | sample CCO memo[pdf] sample CCO[pdf] |
| CPD 99-2 | Compaction Requirements on Shoulders with Rumble Strips [pdf] | 11/22/99 | sample CCO memo [pdf] sample CCO [pdf] FAQs |