Construction Policy Bulletins are linked to the signed document until they are included in the Construction Manual  through the Manual Change Transmittal  process. At that time, the link becomes the chapter and section of the Construction Manual in which the information is included. The documents on this website will require Adobe Acrobat Reader, available as a free download from Adobe’s website (one-time setup). click here to download Adobe Acrobat reader

Policy Bulletins

CPB Number Subject Approval Date Construction Manual Chapter / Section
08-6 Force Account Markups [pdf] 10-10-2008 To be included in Chapter 9-1.03 A,B,
08-5 Seventy Percent Subcontracting [pdf] 10-20-2008 To be included in Chapter 3-801B,
08-4 Federal Highway Administration Involvement in Contract Administration [pdf] 07-24-2008 To be included in Chapter 5-007, 5-308
08-3 Hot Mix Asphalt Materials Acceptance [pdf] 07-03-2008 To be included in Chapter 6-109
  Table 6-1.6 [pdf]    
08-2 Construction Project Stormwater Compliance Evaluation Plan [pdf] 06-30-2008 To be included in Chapter 7-104B
08-1 Contractor Indemnification and Insurance [pdf] 03-13-2008 To be included in Chapter 5-102
  Attachment 1: Sample Letter to Surety [pdf]    
07-7 Release Procedures for Materials Requiring Fit-for-Purpose Decisions [pdf] 12-28-2007 To be included in Chapter 6-202, 5-302
  Attachment 1 Blue Tag Procedures    
07-6 Progress Pay—Entering Contract Milestones into the Contract Administration System [pdf] 9-20-2007 To be included in Chapter 3-802, 5-104C
07-5 Apprentice Registration—Federal Aid Contracts [pdf] 8-27-2007 To be included in Chapter 8-103C,8-105E
  Attachment 1 Federal Apprentice Registration Form 671    
  Attachment 1 Form CEM4900 Contract Change Order    
  Attachment 2 Form CEM4903 Contract Change Order Memorandum    
07-2 Disabled Veteran Business Enterprise Substitutiont [pdf] 4-23-2007 To be included in Chapter 3-801c,8-3,
07-1 Certification Program for Suppliers of Asphalt [pdf] 2-21-2007 To be included in Chapter 6
06-10 Trucking Owner-Operator Certification Status Form [pdf] 12-20-2006  
  Attachment 1: CEM-2510 [pdf]    
06-9 Payment of Construction Disputes with Merit [pdf] 12-15-2006 To be included 5-3, 5-4
06-7 Race-Neutral Disadvantaged Business Enterprise Program [pdf] 11-28-2006 To be included 8-3, 3-801C
06-6 Executed Contract Change Order Copy Distribution [pdf] 11-17-2006 To be included 5-312
06-5 CCO Approval Delegation [pdf] 11-17-2006 To be included 3-403, 5-311, and 5-4
06-4 Beginning of Work [pdf] 10-11-2006 To be included 3.802, 4, and 8-1.03
06-2 Informal Dispute Review Board Process[pdf] 3-20-2006 To be included 5-404B
  Attachment 1: Dispute Review Board Agreement Amendment [pdf]    
  Attachment 2: Contract Change Order[pdf]    
  Attachment 3: Contract Change Order Memo [pdf]    
06-1 Prior Authorization to Proceed[pdf] 2-08-2006 To be included in 5-311
  Attachment: Authorization to Proceed [pdf]    
05-3 Compensation Adjustment for Price Index Fluctuations[pdf] 9-22-2005 To be included in 5-314
00-8 Contract Administration of Time Related Overhead [pdf] 12-15-2000 To be Included in 5-4
  TRO Quantity Sheet Instructions [pdf]    
  TRO Quantity Sheet [pdf]    
       

CPBs already incorporated via Manual Change Transmittals

 

CPB Number

Subject

Construction Manual Chapter/Section

07-4 Federal Highway Administration Form FHWA-47M 3-9, 5-1
07-3 Resident Engineer Policy 1-1
06-8 Solid Waste Disposal and Recycling Report 7-109
06-3 Contract Change Order Memorandum (Form CEM-4903) 5-307
05-5 Contractor Assignment or Name or Address Change
Attachments
5-1
05-4 Revised - Suspected Fraudulent Test and Inspection Reports 3-6 , 3-7, 3-8
05-2 Disposal of Material Outside the Highway Right-of-Way 3-708 , 7-106
05-1 Suspected Fraudulent Test and Inspection Reports 3-6 , 3-7, 3-8
04-4 Use of Tapered Notched Wedge Device for Longitudinal Joints on Asphalt Concrete Pavement 4-3902A , 4-3903B
04-3 Manual on Uniform Traffic Control Devices Adoption 1-308 , 2-201 , 2-206F , 2-207
04-2 Retention Policy Modification 3-909
04-1 Solid Waste Disposal and Recycling Report 7-109
03-11 Scope of Contract 3-4
03-9 Title 6 Equal Opportunity Complaints and Contract Administration 8-2
03-7 Title 7 Equal Employment Opportunity Complaints and Reporting 8-2
03-6 Character of Workers 3-5
03-5 Claim Administration Delegation of Authority 5-4.69
03-3 Communication between the Resident Engineer and Federal Highway Administration Transportation Engineer on State Administered Projects 5-3
03-2 Overhead Sign Structures 4-56
03-1 Paint Binder Tack Coat Guidelines 4-39 , 4-92, 4-94
02-5 Contract Change Order Coding System 5-302, 5-307
02-3 Extended Use of Dispute Review Boards 5-4
02-2 Arbritration Payment Process 5-409B
02-1 Dispute Review Board Process and Responsibilities 5-4
  CEM-6202  
  CEM-6203  
  CEM-6204  
  CEM-6205  
01-5 Contract Offset 3-9
  Notice of Opportunity for Offset Hearing
01-3 Audit Request Procedure 5-407
Audit Process, Sample, Attachment to Audit Request
General Info, Request for State Audit
CPA Desk Guide
01-2 Required District Director's Board of Review (BOR) Meetings 5-404G
Sample Claim Position Letter
Sample Final Estimate Cover Memo (1)
Sample Final Estimate Cover Memo (2)
01-1 Major Construction Incidents 2-3
Major Incident Notification, Instructions
00-7 Termination of Contractors Control and Termination of Contract 3-807 and 3-810
00-6 Additional Funds Request Process 5-203
Request for Additional Funds, Program Advisers
00-5 Section 3-704E Highway Maintenance 3-704 and 5-006
Section 5-006 Maintenance Reviews
00-4 Cost Reduction Incentive Proposal Procedures 3-514
00-3 Disadvantaged Business Enterprises Reporting 8-3
  CEM-2401  
  CEM-2402F  
  CEM-2403F  
  CEM-2404F  
00-2 High Groundwater 4-1903A(8)
00-1 Storm Water Notice of Completion of Construction, NOC Form 7-104 and 5-101
99-8 Horizontal/Vertical Clearance Changes and Bridge Permit Rating 3-705A(1)
  Attached forms can be found on CEFS: TR0019,TR0020, TR0029  
99-7 COZEEP Procedures, Task Order, Daily Report Form, Worksheet 2-215
99-6 COZEEP Guidelines 2-215A
99-5.1 Contract Change Order Approval Delegation FAQs 5-3
99-4 Contractor Indemnification and Insurance FAQs 3-701
99-2 Removal of Yellow Traffic Stripe and Pavement Markings 7-106B(2)
99-1 Contract Acceptance and Relief of Maintenance Process 3-709 and 3-710
  Attachments  
96-7 After Acceptance Estimates 3-910
96-6 Overhead Audits 5-407
96-5 Claims Resolution Approval Authority Table 5-4.1
96-4 Claims Resolution Time Charging Practices 5-401
96-3 Traffic Control System Adjustment 4-1203O(1)
96-2 Use of Leftover Portland Cement Concrete (PCC) 4-9003A
96-1 Frequency of Sampling - Structural Concrete Table 6-1.4
95-7 Storm Water Management Program 7-104B
95-6 Travel Costs for Out of State Inspections 3-606
95-5 Trade Names Alternatives, Signing and Delineation Materials 2-209
95-4 Construction Area Signs 4-1203F
95-3 Availability of Changeable Message Signs (CMS) 4-1203J
95-2 Application of 5% Markup for Subcontracted Work 3-904C
95-1 Field Inspection and Release of Materials 6-302