State of California Department of Transportation
Page 1
 Statement of Ongoing Contracts as of  04/20/08
05/01/08
District 06
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message

06-FRE-5-37.2/48.6 IN FRESNO COUNTY NEAR MENDOTA FROM 1.7 KM SOUTH OF KAMM AVENUE TO 0.6 KM SOUTH OF PANOCHE ROAD
GRANITE CONSTRUCTION HADDADIN, HAIDAR  $8,006,953 07/24/07  25%
06-0E0504   3240 N. MILLBROOK  $1,131,416 08/17/07
ACIM-005 -(135)E  $0 01/18/08  14%
FRESNO, CA 93726
IM00-5 53-(6E) REHABILITATE PAVEMENT    
--() (831)724-1011 (559)243-3599  
HA22 WPCP
06-FRE-33-62.5/69.5 IN FRESNO COUNTY IN MENDOTA AND FIREBAUGH FROM 0.1 KM SOUTH OF BASS AVENUE TO 0.4 NORTH OF MAIN CANAL BRIDGE
LEE'S PAVING INC. BAINS, DEL  $5,890,437 10/04/02  100%
06-343534 1212 N. PLAZA DR. 8530 W. ROOSEVELT AVE.
 $5,899,047 10/18/02  98%
ACST-P033-(058)E  $0 10/29/08
  P0-33 0-(8E) VISALIA, CA 93291  
VISALIA, CA 93291
--()   OVER RUN
WIDEN EXISTING HIGHWAY (559)651-8314
HA22 SWPPP
06-FRE-41-22.5/25.6 IN FRESNO COUNTY IN FRESNO AT VARIOUS LOCATIONS
GOLD VALLEY CONSTRUCTION INC. SAMIMI, MOHAMMAD  $3,458,233 01/17/07  0%
06-431804 P.O. BOX 1535 3240 N. MILLBROOK  $3,132,734 02/09/07
 0%
ACNH-X019-(020)E PLANTING AND IRRIGATION FRESNO, CA 93726  $34,121 08/19/09
--() ROCKLIN, CA 95677  
(559)243-3814
     PLANT EST SATIS
SWPPP
HA25
06-FRE-41-30.4/31.8 IN FRESNO COUNTY IN FRESNO FROM HERNDON AVENUE UNDERCROSSING TO  0.1 KM NORTH OF FRIANT ROAD UNDERCROSSING
SHASTA CONSTRUCTORS INC. MENGONI, MARK  $5,334,448 04/23/07  81%
06-419614 P.O. BOX 491539 505 N STREET  $5,002,707 05/10/07
    $729,815 06/25/08  93%
FRESNO, CA 93721
   EXTEND EXISTING AUXILIARY LANE REDDING, CA  96049-1539  
     (559)445-5595  
  SWPPP
06-FRE-43-5.3/0 IN FRESNO COUNTY NEAR SELMA FROM 0.4 KM SOUTH OF CONEJO AVENUE TO 0.3 KM NORTH OF CONEJO AVENUE
TEICHERT CONSTRUCTION HADDADIN, HAIDAR  $965,119 07/12/07  100%
06-494604 P.O. BOX 400 3240 N. MILLBROOK  $917,496 07/31/07  100%
ACST-P043-(036)E  $0 03/05/08
FRESNO, CA 93726  
  P0-43 0-(6E) INSTALL TRAFFIC SIGNAL KINGSBURG, CA 93631
--()   (559)243-3599  
HB1 SWPPP
06-FRE-99-10.7/15.9 IN FRESNO COUNTY IN AND NEAR FOWLER FROM 0.7 KM SOUTH OF MERCED STREET UNDERCROSSING TO 0.5 KM NORTH OF CLOVIS AVENUE UNDERCROSSIN
WATKINS AND BORTOLUSSI, INC. ABOUZEDAN, RAAID  $743,009 08/27/07  79%
06-420314 77 LARKSPUR STREET 3240 N. MILLBROOK  $314,050 10/03/07
 42%
   FRESNO, CA 93726  $53,614 06/02/11
   SAN RAFAEL, CA 94903  
(559)243-3598
   PLANTING AND IRRIGATION    
SWPPP
HA22

State of California Department of Transportation
Page 2
 Statement of Ongoing Contracts as of  04/20/08
05/01/08
District 06
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message
06-FRE-99-10.7/15.4 IN FRESNO COUNTY NEAR FRESNO FROM MERCED STREET UC TO CHESTNUT  AVENUE OC AND FROM HERNDON CANAL BR TO SAN JOAQUIN RIVER BRIDGE
MARTIN BROTHERS ABOUZEDAN, RAAID  $2,257,282 12/18/07  0%
06-0G6504 20 LIGHT SKY COURT 3240 N. MILLBROOK  $0 01/14/08
    $0    0%
FRESNO, CA 93726
   SACRAMENTO, CA 95828  
     (559)243-3598 SUSPENDED
PLACE BONDED WEARING COURSE
HM WPCP
06-FRE-99-12.2/14.5 IN FRESNO COUNTY NEAR FOWLER FROM 0.2 KM SOUTH OF CLOVIS AVENUE UNDERCROSSING TO AMERICAN AVENUE OVERCROSSING
J. S. BRAR HADDADIN, HAIDAR  $472,025 01/31/05  32%
06-458604 2779 BULLARD AVENUE 3240 N. MILLBROOK  $424,422 02/14/05  89%
ACST-P099-(482)E  $0 09/15/09
  P0-99 4-(2ES)T CLOVIS, CA 93611 FRESNO, CA 93726  
6206- 005-()   (559)243-3599  
HIGHWAY PLANTING AND IRRIGATION
HB4 SWPPP
06-FRE-99-21.4/22.4 IN FRESNO COUNTY IN FRESNO ON ROUTE 99 AND ON ROUTE 180
WATKIN AND BORTOLUSSI INC    $1,710,316 03/18/08  0%
06-462804 77 LARKSPUR STREET    $0 04/23/08
 0%
   HIGHWAY PLANTING AND IRRIGATION    $0  
   SAN RAFAEL CA 949014886  
 
   (415)453-4691  
SWPPP
HA25
06-FRE-99-22.2/0 IN FRESNO COUNTY IN FRESNO AT ROUTE 99/180 SEPARATION
DREAMBUILDER LARRY ALLRED  $131,415 10/24/07  90%
06-0C0404 1361 E GARTEN DR 3240 N MILLBROOK  $126,779 12/17/07
    $126,779 04/21/08  93%
INSTALL CONCRETE BARRIER FRESNO, CA 93726
   PLACENTIA CA 92870  
   (714)646-3697 (559)243-3881  
HB1 WPCP
06-FRE-99-24.2/26.7 IN FRESNO COUNTY IN FRESNO FROM NORTH FRESNO UNDERCROSSING TO 0.1 KM NORTH OF ASHLAN AVENUE  OVERCROSSING
BELAIRE WEST LANDSCAPE, INC. SAMIMI, MOHAMMAD  $910,705 06/17/03  100%
06-453204 P.O. BOX 6270    $883,949 06/27/03  100%
    $0 02/23/07
   
   PLANTING AND IRRIGATION BUENA PARK, CA 90622
     (559)445-6727  
HB32 SWPPP
06-FRE-168-29.3/0 IN FRESNO COUNTY NEAR AUBERRY SANCHEZ GRADING MENGONI, MARK  $250 04/18/06  0%
06-0F8804 5070 N SIXTH ST., STE 176 505 N STREET  $0 05/24/06
CULVERT REPAIR/SLOPE STABILIZATION  0%
   FRESNO, CA 93721  $0 07/14/06
   FRESNO, CA 93710  
(559)445-5595
      
  
202.02

State of California Department of Transportation
Page 3
 Statement of Ongoing Contracts as of  04/20/08
05/01/08
District 06
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message
06-FRE-180-24.6/27.3 IN FRESNO COUNTY NEAR MENDOTA FROM BELMONT AVENUE TO 0.5 KM EAST OF KINGS SLOUGH BRIDGE
R G W CONSTRUCTION INC ALLRED, LARRY  $8,113,112 02/22/08  0%
06-420504 P O BOX 2910 3240 N MILLBROOK  $70,508 03/14/08
ACNH-P180-(052)E  $70,508 10/01/08  1%
 
BHP1-80 0-(2EN)H ASPHALT CONCRETE RESURFACING LIVERMORE CA 94551  
P180- 052-() (925)606-2400 (559)243-3881  
HA22 HA22
SWPPP
06-FRE-180-31.3/0 IN FRESNO COUNTY NEAR MENDOTA AT FOUR MILE SLOUGH BRIDGE
DAYLEN, INC ALLRED, LARRY  $96,384 12/19/02  100%
06-478904 1039 E. SANTA ANA 505 N STREET  $94,611 12/27/02
    $0 03/16/06  100%
MITIGATION PLANTING AND IRRIGATION FRESNO, CA 93723  
   FRESNO  CA  93704
     (559)445-5004 OVER RUN
HA22 WPCP
06-FRE-180-55.4/56.6 IN FRESNO COUNTY IN FRESNO AT VARIOUS LOCATIONS
WATKIN AND BORTOLUSSI INC FORSTER AND KROEGER LANDSCAPE MAINTENANCE INC A JOINT VENTURE
ALLRED, LARRY  $1,745,978 10/27/06  0%
06-342344 505 N STREET  $1,282,363 11/20/06  0%
STP-    -(   ) HIGHWAY PLANTING AND IRRIGATION FRESNO CA 93721  $16,183 05/03/10
--()  
(559)445-5004
   PLANT EST SATIS
77 LARKSPUR STREET
HE14 SWPPP
SAN RAFAEL CA 949014886
(415)453-4691
06-FRE-180-60.3/64 IN FRESNO COUNTY IN AND NEAR FRESNO FROM ROUTE 168 TO CLOVIS AVENUE
WATKIN & BORTOLUSSI INC./ FORSTER & KROEGER LANDSCAPE INC., A JOINT VENTURE
SAMIMI, MOHAMMAD  $3,801,515 11/22/06  0%
06-342444  $2,897,142 12/19/06
   3240 N. MILLBROOK  $22,470 04/06/11  0%
HIGHWAY PLANTING AND IRRIGATION FRESNO, CA 93726
    
   77 LARKSPUR STREET (559)243-3814 PLANT EST SATIS
HE14 SWPPP SAN RAFAEL, CA 94901
 
06-FRE-180-63.3/66.5 IN FRESNO COUNTY IN AND NEAR FRESNO FROM 0.2 KM EAST OF CLOVIS AVENUE OVERCROSSING TO 1.3 KM EAST OF TEMPERANCE AVENUE
SECURITY PAVING COMPANY, INC. OSCAR SHERRILL  $48,509,360 12/20/07  8%
06-342434 P.O. BOX 1489 3240 N. MILLBROOK  $4,276,582 01/08/08
    $3,486,533 10/06/09  9%
FRESNO, CA 93726-5866
   SUN VALLEY, CA  91353-1489  
     (559)243-3812  
CONSTRUCT FREEWAY AND BRIDGES
HE14 SWPPP
06-KER-5-3.0/3.6 IN KERN COUNTY NEAR LEBEC FROM 0.1 KM NORTH OF CRESSEY CATTLEPASS BRIDGE TO 0.7 KM SOUTH OF LEBEC  ROAD OVERCROSSING
CRUCO CONSTRUTION GROUP INC. 2443 FOUNDRY PARK AVE FRESNO, CA 93706
JIM BURFORD  $399,448 01/18/08  96%
06-418714 1824 NORRIS ROAD  $373,849 02/08/08  93%
    $318,728 04/24/08
BAKERSFIELD, CA 93308  
   2443 FOUNDRY PARK AVE
   (661)332-4208  
REMOVE BRAKE INSPECTION AREA
HB4N SWPPP FRESNO, CA 93706
 

State of California Department of Transportation
Page 4
 Statement of Ongoing Contracts as of  04/20/08
05/01/08
District 06
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message
06-KER-5-10.2/15.8 IN KERN COUNTY NEAR LEBEC FROM GRAPEVINE ROAD UNDERCROSSING TO ROUTE 5 AND 99 SEPARATION
PETERSON CHASE GENERAL ENGINEERING CONSTRUCTION INC.
HISHAM ALNATOUR  $2,575,140 08/15/07  32%
06-0E2304  $1,225,720 09/17/07
ACIM-005 -(179)E 1824 NORRIS ROAD  $1,220,345 07/11/08  46%
1792 KAISER AVE BAKERSFIELD, CA 93308
--() RESURFACE CONCRETE PAVEMENT  
   IRVINE, CA 92614-5706 (661)391-4747  
HA22 WPCP  
06-KER-5-62.0/82.5 IN KERN COUNTY NEAR LOST HILLS AND IN AND NEAR MCFARLAND
PROFESSIONAL CONSTRUCTION SERVICES
AMARJIT DHALIWAL  $591,765 12/10/07  54%
06-0G6204 805 S. LEXINGTON ST.  $567,857 01/03/08  94%
    $567,857 05/12/08
   REPLACE CONCRETE PANELS 3309 VINCENT RD. DELANO, CA 93215  
   PLEASANT HILL, CA 94523 (661)720-0972  
  WPCP  
06-KER-33-36.6/0 IN KERN COUNTY NEAR MCKITTRICK AT 3.7 KM NORTH OF ROUTE 58
BUGLER CONSTRUCTION PETER MULLALY  $317,920 09/26/07  0%
06-0F8204 47000 WARM SPRINGS BLVD 101 805 S. LEXINGTON ST.  $0 10/12/07
 0%
   EXTEND EXISTING BOX CULVERT DELANO, CA 93215  $0  
   FREMONT, CA 94539  
(661)720-0971
      
WPCP
HB1
06-KER-41-/5 IN SAN LUIS OBISPO, KERN AND KING COUNTIES AT VARIOUS LOCATIONS
KIEWIT PACIFIC CO ERIC KARLSON  $34,018,911 10/04/06  76%
06-3829U4 2200 COLUMBIA HOUSE BLVD.  $29,359,397 10/19/06
ACNH-P041-(102)E 8530 WEST ROOSEVELT AVENUE
 $635,765 08/21/08  92%
REALIGN HIGHWAY AND REPLACE BRIDGE
--() VANCOUVER, WA 98661  
     VISALIA, CA 93291  
HA22 SWPPP (559)386-4971
06-KER-58-43.9/0 IN KERN COUNTY NEAR BAKERSFIELD AT HEATH ROAD
MAVERICK ASPHALT INC. PETER MULLALY  $800,653 06/28/07  93%
06-495504   805 S. LEXINGTON ST.  $701,645 07/24/07  85%
    $26,927 04/24/08
INSTALL SIGNALS DELANO, CA 93215  
    
     (661)720-0971