 Statement of Ongoing Contracts as of  12/20/07
01/02/08
District 06
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message

06-FRE-5-15.9/64.6 IN FRESNO COUNTY AT VARIOUS LOCATIONS PENHALL COMPANY LARRY ALLRED  $133,330 04/25/07  100%
06-0C4704 TREAT BRIDGE DECK 13750 CATALINA STREET 505 N STREET  $135,679 05/11/07  100%
    $0 07/16/07
FRESNO, CA 93721
   SAN LEANDRO CA 94577  
   (510)357-8810 (559)445-5004  
HM3 WPCP
06-FRE-5-20.0/38 IN FRESNO COUNTY NEAR COALINGA FROM 1.6 KM SOUTH OF TUOLUMNE AVENUE OVERCROSSING TO 0.3 KM NORTH OF DERRICK AVENUE OVERCROSSING
GRANITE CONSTRUCTION HADDADIN, HAIDAR  $2,404,747 09/29/06  100%
06-0E9904 P.O. BOX 50085 505 N STREET  $2,058,769 10/10/06  100%
    $0 07/20/07
   WATSONVILLE, CA 95077 FRESNO, CA 93721  
     (559)445-6720  
ASPHALT CONCRETE PAVEMENT OVERLAY
HM1A WPCP
06-FRE-5-37.2/48.6 IN FRESNO COUNTY NEAR MENDOTA FROM 1.7 KM SOUTH OF KAMM AVENUE TO 0.6 KM SOUTH OF PANOCHE ROAD
GRANITE CONSTRUCTION HADDADIN, HAIDAR  $8,006,953 07/24/07  25%
06-0E0504   3240 N. MILLBROOK  $1,131,416 08/17/07
 14%
ACIM-005 -(135)E FRESNO, CA 93726  $0 01/18/08
IM00-5 53-(6E)    
REHABILITATE PAVEMENT (559)243-3599
--() (831)724-1011  
WPCP
HA22
06-FRE-5-50.0/55.6 IN FRESNO COUNTY IN FRESNO FROM PANOCHE CREEK BRIDGE TO CALIFORNIA AVENUE OVERCROSSING
M BUMGARNER INC HADDADIN, HAIDAR  $1,131,800 08/14/07  100%
06-0F2204 1175 GREENVILLE ROAD 3240 N. MILLBROOK  $1,125,396 09/28/07
ACIM-005 -(136)E  $0 11/26/07  100%
FRESNO, CA 93726
  00-5 51-(6E) CONSTRUCT MEDIAN BARRIER LIVERMORE CA 94550 11/27/07
--() (925)373-1986 (559)243-3599 COMPLETED
HB1 WPCP
06-FRE-33-62.5/69.5 IN FRESNO COUNTY IN MENDOTA AND FIREBAUGH FROM 0.1 KM SOUTH OF BASS AVENUE TO 0.4 NORTH OF MAIN CANAL BRIDGE
LEE'S PAVING INC. BAINS, DEL  $5,890,437 10/04/02  100%
06-343534 1212 N. PLAZA DR. 8530 W. ROOSEVELT AVE.
 $5,899,047 10/18/02  98%
ACST-P033-(058)E  $0 10/29/08
 
  P0-33 0-(8E) VISALIA, CA 93291 VISALIA, CA 93291
--()   OVER RUN
WIDEN EXISTING HIGHWAY (559)651-8314
HA22 SWPPP
06-FRE-41-22.5/25.6 IN FRESNO COUNTY IN FRESNO AT VARIOUS LOCATIONS
GOLD VALLEY CONSTRUCTION INC. SAMIMI, MOHAMMAD  $3,439,483 01/17/07  56%
06-431804 P.O. BOX 1535 3240 N. MILLBROOK  $2,854,913 02/09/07
 83%
ACNH-X019-(020)E PLANTING AND IRRIGATION FRESNO, CA 93726  $354,977 08/11/09
--() ROCKLIN, CA 95677  
(559)243-3814
      
SWPPP
HA25

State of California Department of Transportation
Page 2
 Statement of Ongoing Contracts as of  12/20/07
01/02/08
District 06
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message
06-FRE-41-22.5/33.4 IN FRESNO COUNTY IN FRESNO FROM SOUTH FRESNO VIADUCT TO MADERA COUNTY LINE
AMERICAN CIVIL CONSTRUCTORS WEST COAST, INC.
ABOUZEDAN, RAAID  $1,973,174 05/07/07  100%
06-0E1504  $1,964,211 05/25/07
   3240 N. MILLBROOK  $0 11/29/07  100%
3701 MALLARD DRIVE FRESNO, CA 93726
   GRIND PORTLAND CEMENT PAVEMENT  
   BENICIA, CA 94510 (559)243-3598  
HM1B WPCP  
06-FRE-41-30.4/31.8 IN FRESNO COUNTY IN FRESNO FROM HERNDON AVENUE UNDERCROSSING TO  0.1 KM NORTH OF FRIANT ROAD UNDERCROSSING
SHASTA CONSTRUCTORS INC. MENGONI, MARK  $5,284,406 04/23/07  46%
06-419614 P.O. BOX 491539 505 N STREET  $3,275,110 05/10/07  62%
    $559,027 06/25/08
   REDDING, CA  96049-1539 FRESNO, CA 93721  
EXTEND EXISTING AUXILIARY LANE
     (559)445-5595  
  SWPPP
06-FRE-43-5.3/0 IN FRESNO COUNTY NEAR SELMA FROM 0.4 KM SOUTH OF CONEJO AVENUE TO 0.3 KM NORTH OF CONEJO AVENUE
TEICHERT CONSTRUCTION HADDADIN, HAIDAR  $950,083 07/12/07  67%
06-494604 P.O. BOX 400 3240 N. MILLBROOK  $816,261 07/31/07
 86%
ACST-P043-(036)E FRESNO, CA 93726  $150,779 02/04/08
  P0-43 0-(6E) KINGSBURG, CA 93631  
INSTALL TRAFFIC SIGNAL (559)243-3599
--()    
SWPPP
HB1
06-FRE-99-.7/7.4 IN FRESNO COUNTY IN AND NEAR KINGSBURG AND SELMA FROM ROUTE 99 AND 201 SEPARATION TO 1.5 KM  NORTH OF FLORAL AVENUE UNDERCROSSING
F C I CONSTRUCTORS INC WOODS, JOHN A  $60,425,142 11/23/05  0%
06-350704 2100 GOODYEAR ROAD 505 N STREET  $59,074,545 12/13/05
ACNH-P099-(450)E  $465,330 02/21/08  0%
FRESNO, CA 93721
BHP0-99 4-(0EN)H BENICIA CA 94510  
P099- 450-() (707)742-6000 (559)445-6308 PLANT EST SATIS
WIDEN AND REHABILITATE FREEWAY
HE13 SWPPP
06-FRE-99-10.7/15.9 IN FRESNO COUNTY IN AND NEAR FOWLER FROM 0.7 KM SOUTH OF MERCED STREET UNDERCROSSING TO 0.5 KM NORTH OF CLOVIS AVENUE UNDERCROSSIN
WATKINS AND BORTOLUSSI, INC. ABOUZEDAN, RAAID  $742,809 08/27/07  23%
06-420314 77 LARKSPUR STREET 3240 N. MILLBROOK  $7,757 10/03/07  1%
    $7,757 05/26/11
FRESNO, CA 93726  
   SAN RAFAEL, CA 94903
     (559)243-3598  
PLANTING AND IRRIGATION
HA22 SWPPP
06-FRE-99-12.2/14.5 IN FRESNO COUNTY NEAR FOWLER FROM 0.2 KM SOUTH OF CLOVIS AVENUE UNDERCROSSING TO AMERICAN AVENUE OVERCROSSING
J. S. BRAR HADDADIN, HAIDAR  $472,025 01/31/05  32%
06-458604 2779 BULLARD AVENUE 3240 N. MILLBROOK  $424,422 02/14/05
 89%
ACST-P099-(482)E FRESNO, CA 93726  $0 09/15/09
  P0-99 4-(2ES)T CLOVIS, CA 93611  
(559)243-3599
6206- 005-() HIGHWAY PLANTING AND IRRIGATION    
SWPPP
HB4

State of California Department of Transportation
Page 3
 Statement of Ongoing Contracts as of  12/20/07
01/02/08
District 06
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message
06-FRE-99-22.2/0 IN FRESNO COUNTY IN FRESNO AT ROUTE 99/180 SEPARATION
DREAMBUILDER    $131,415 10/24/07  0%
06-0C0404 1361 E GARTEN DR    $0 12/17/07
    $0    0%
INSTALL CONCRETE BARRIER  
   PLACENTIA CA 92870  
   (714)646-3697    
HB1 WPCP
06-FRE-99-24.2/26.7 IN FRESNO COUNTY IN FRESNO FROM NORTH FRESNO UNDERCROSSING TO 0.1 KM NORTH OF ASHLAN AVENUE  OVERCROSSING
BELAIRE WEST LANDSCAPE, INC. SAMIMI, MOHAMMAD  $910,705 06/17/03  100%
06-453204 P.O. BOX 6270    $883,949 06/27/03  100%
    $0 02/23/07
   BUENA PARK, CA 90622    
PLANTING AND IRRIGATION
     (559)445-6727  
HB32 SWPPP
06-FRE-168-29.3/0 IN FRESNO COUNTY NEAR AUBERRY SANCHEZ GRADING MENGONI, MARK  $250 04/18/06  0%
06-0F8804 5070 N SIXTH ST., STE 176 505 N STREET  $0 05/24/06
CULVERT REPAIR/SLOPE STABILIZATION  0%
   FRESNO, CA 93721  $0 07/14/06
   FRESNO, CA 93710  
(559)445-5595
      
  
202.02
06-FRE-180-31.3/0 IN FRESNO COUNTY NEAR MENDOTA AT FOUR MILE SLOUGH BRIDGE
DAYLEN, INC ALLRED, LARRY  $96,384 12/19/02  100%
06-478904 1039 E. SANTA ANA 505 N STREET  $94,611 12/27/02
    $0 03/16/06  100%
MITIGATION PLANTING AND IRRIGATION FRESNO, CA 93723
   FRESNO  CA  93704  
     (559)445-5004 OVER RUN
HA22 WPCP
06-FRE-180-55.4/56.6 IN FRESNO COUNTY IN FRESNO AT VARIOUS LOCATIONS
WATKIN AND BORTOLUSSI INC FORSTER AND KROEGER LANDSCAPE MAINTENANCE INC A JOINT VENTURE
ALLRED, LARRY  $1,745,978 10/27/06  0%
06-342344 505 N STREET  $1,220,568 11/20/06  0%
STP-    -(   )  $16,183 05/03/10
HIGHWAY PLANTING AND IRRIGATION FRESNO CA 93721  
--()
   (559)445-5004 PLANT EST SATIS
77 LARKSPUR STREET
HE14 SWPPP
SAN RAFAEL CA 949014886
(415)453-4691
06-FRE-180-60.3/64 IN FRESNO COUNTY IN AND NEAR FRESNO FROM ROUTE 168 TO CLOVIS AVENUE
WATKIN & BORTOLUSSI INC./ FORSTER & KROEGER LANDSCAPE INC., A JOINT VENTURE
SAMIMI, MOHAMMAD  $3,776,515 11/22/06  80%
06-342444  $2,764,792 12/19/06
   3240 N. MILLBROOK  $201,526 03/24/11  73%
HIGHWAY PLANTING AND IRRIGATION FRESNO, CA 93726
    
77 LARKSPUR STREET (559)243-3814
    
SWPPP SAN RAFAEL, CA 94901
HE14
 

State of California Department of Transportation
Page 4
 Statement of Ongoing Contracts as of  12/20/07
01/02/08
District 06
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message
06-KER-5-10.2/15.8 IN KERN COUNTY NEAR LEBEC FROM GRAPEVINE ROAD UNDERCROSSING TO ROUTE 5 AND 99 SEPARATION
PETERSON CHASE GENERAL ENGINEERING CONSTRUCTION INC
   $2,575,140 08/15/07  0%
06-0E2304  $0 09/17/07
ACIM-005 -(179)E    $0    0%
1792 KAISER AVE  
--() RESURFACE CONCRETE PAVEMENT  
   IRVINE CA 926145706 (661)391-4747  
HA22 WPCP (949)252-0441
06-KER-14-16.2/26.6 IN KERN COUNTY IN AND NEAR MOJAVE AT VARIOUS LOCATIONS
GRANITE CONSTRUCTION COMPANY BAKERSFIELD BRANCH
BURFORD JIMES  $47,619,310 01/24/06  100%
06-408404 P.O. 81197  $47,803,095 02/02/06  100%
    $0 12/14/07
   WIDEN HIGHWAY P.O.BOX 5127 BAKERSFIELD CA 93380 12/18/07
   BAKERSFIELD, CA. 93388-5127 (661)824-0260 COMPLETED
HE13 HE13
SWPPP  
06-KER-33-36.6/0 IN KERN COUNTY NEAR MCKITTRICK AT 3.7 KM NORTH OF ROUTE 58
BUGLER CONSTRUCTION PETER MULLALY  $317,920 09/26/07  0%
06-0F8204 47000 WARM SPRINGS BLVD 101 805 S. LEXINGTON ST.  $0 10/12/07  0%
   EXTEND EXISTING BOX CULVERT DELANO, CA 93215  $0  
   FREMONT, CA 94539  
(661)720-0971
      
HB1 WPCP
06-KER-41-/5 IN SAN LUIS OBISPO, KERN AND KING COUNTIES AT VARIOUS LOCATIONS
KIEWIT PACIFIC CO ERIC KARLSON  $33,489,674 10/04/06  56%
06-3829U4 2200 COLUMBIA HOUSE BLVD.  $25,773,172 10/19/06
8530 WEST ROOSEVELT AVENUE
 84%
ACNH-P041-(102)E REALIGN HIGHWAY AND REPLACE BRIDGE  $1,709,405 08/12/08
--() VANCOUVER, WA 98661  
VISALIA, CA 93291
      
SWPPP (559)386-4971
HA22
06-KER-46-30.5/0 IN KERN COUNTY IN LOST HILLS AT  LOST HILLS AND WOODWARD STREETS
GRIFFITH COMPANY AMARJIT DHALIWAL  $478,571 09/25/06  96%
06-0A0604 P.O. BOX 70157 805 S. LEXINGTON ST.  $465,225 10/03/06
    $0 09/24/07  94%
INSTALL SIGNALS DELANO, CA 93215  
   BAKERSFIELD, CA 93387-0157
     (661)720-0972 SUSPENDED