 Statement of Ongoing Contracts as of  03/20/08
04/02/08
District 06
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message

06-FRE-5-15.9/64.6 IN FRESNO COUNTY AT VARIOUS LOCATIONS PENHALL COMPANY LARRY ALLRED  $133,330 04/25/07  100%
06-0C4704 TREAT BRIDGE DECK 13750 CATALINA STREET 505 N STREET  $135,932 05/11/07  100%
    $0 07/16/07
FRESNO, CA 93721
   SAN LEANDRO CA 94577  
   (510)357-8810 (559)445-5004  
HM3 WPCP
06-FRE-5-20.0/38 IN FRESNO COUNTY NEAR COALINGA FROM 1.6 KM SOUTH OF TUOLUMNE AVENUE OVERCROSSING TO 0.3 KM NORTH OF DERRICK AVENUE OVERCROSSING
GRANITE CONSTRUCTION HADDADIN, HAIDAR  $2,404,747 09/29/06  100%
06-0E9904 P.O. BOX 50085 505 N STREET  $2,058,769 10/10/06  100%
    $0 07/20/07
   WATSONVILLE, CA 95077 FRESNO, CA 93721  
     (559)445-6720  
ASPHALT CONCRETE PAVEMENT OVERLAY
HM1A WPCP
06-FRE-5-37.2/48.6 IN FRESNO COUNTY NEAR MENDOTA FROM 1.7 KM SOUTH OF KAMM AVENUE TO 0.6 KM SOUTH OF PANOCHE ROAD
GRANITE CONSTRUCTION HADDADIN, HAIDAR  $8,006,953 07/24/07  25%
06-0E0504   3240 N. MILLBROOK  $1,131,416 08/17/07
 14%
ACIM-005 -(135)E FRESNO, CA 93726  $0 01/18/08
IM00-5 53-(6E)    
REHABILITATE PAVEMENT (559)243-3599
--() (831)724-1011  
WPCP
HA22
06-FRE-33-62.5/69.5 IN FRESNO COUNTY IN MENDOTA AND FIREBAUGH FROM 0.1 KM SOUTH OF BASS AVENUE TO 0.4 NORTH OF MAIN CANAL BRIDGE
LEE'S PAVING INC. BAINS, DEL  $5,890,437 10/04/02  100%
06-343534 1212 N. PLAZA DR.  $5,899,047 10/18/02
ACST-P033-(058)E 8530 W. ROOSEVELT AVE.
 $0 10/29/08  98%
  P0-33 0-(8E) VISALIA, CA 93291  
--()   VISALIA, CA 93291 OVER RUN
WIDEN EXISTING HIGHWAY
HA22 SWPPP (559)651-8314
06-FRE-41-22.5/25.6 IN FRESNO COUNTY IN FRESNO AT VARIOUS LOCATIONS
GOLD VALLEY CONSTRUCTION INC. SAMIMI, MOHAMMAD  $3,458,233 01/17/07  0%
06-431804 P.O. BOX 1535 3240 N. MILLBROOK  $3,098,613 02/09/07  0%
ACNH-X019-(020)E  $51,418 08/13/09
PLANTING AND IRRIGATION FRESNO, CA 93726  
--() ROCKLIN, CA 95677
     (559)243-3814 PLANT EST SATIS
HA25 SWPPP
06-FRE-41-22.5/33.4 IN FRESNO COUNTY IN FRESNO FROM SOUTH FRESNO VIADUCT TO MADERA COUNTY LINE
AMERICAN CIVIL CONSTRUCTORS WEST COAST, INC.
ABOUZEDAN, RAAID  $1,973,174 05/07/07  100%
06-0E1504  $1,964,211 05/25/07
3240 N. MILLBROOK  100%
   3701 MALLARD DRIVE FRESNO, CA 93726  $0 11/29/07
    
GRIND PORTLAND CEMENT PAVEMENT (559)243-3598
   BENICIA, CA 94510  
HM1B WPCP  

State of California Department of Transportation
Page 2
 Statement of Ongoing Contracts as of  03/20/08
04/02/08
District 06
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message
06-FRE-41-30.4/31.8 IN FRESNO COUNTY IN FRESNO FROM HERNDON AVENUE UNDERCROSSING TO  0.1 KM NORTH OF FRIANT ROAD UNDERCROSSING
SHASTA CONSTRUCTORS INC. MENGONI, MARK  $5,323,958 04/23/07  74%
06-419614 P.O. BOX 491539 505 N STREET  $4,272,892 05/10/07
    $444,517 06/25/08  80%
FRESNO, CA 93721
   EXTEND EXISTING AUXILIARY LANE REDDING, CA  96049-1539  
     (559)445-5595  
  SWPPP
06-FRE-43-5.3/0 IN FRESNO COUNTY NEAR SELMA FROM 0.4 KM SOUTH OF CONEJO AVENUE TO 0.3 KM NORTH OF CONEJO AVENUE
TEICHERT CONSTRUCTION HADDADIN, HAIDAR  $965,119 07/12/07  100%
06-494604 P.O. BOX 400 3240 N. MILLBROOK  $897,664 07/31/07  100%
ACST-P043-(036)E  $0 03/05/08
  P0-43 0-(6E) KINGSBURG, CA 93631 FRESNO, CA 93726  
INSTALL TRAFFIC SIGNAL
--()   (559)243-3599  
HB1 SWPPP
06-FRE-99-.7/7.4 IN FRESNO COUNTY IN AND NEAR KINGSBURG AND SELMA FROM ROUTE 99 AND 201 SEPARATION TO 1.5 KM  NORTH OF FLORAL AVENUE UNDERCROSSING
F C I CONSTRUCTORS INC WOODS, JOHN A  $60,646,205 11/23/05  100%
06-350704 2100 GOODYEAR ROAD 505 N STREET  $59,632,310 12/13/05
 100%
ACNH-P099-(450)E FRESNO, CA 93721  $0 02/27/08
BHP0-99 4-(0EN)H BENICIA CA 94510 02/27/08
(559)445-6308
P099- 450-() WIDEN AND REHABILITATE FREEWAY (707)742-6000 PLANT EST SATIS
SWPPP
HE13
06-FRE-99-10.7/15.9 IN FRESNO COUNTY IN AND NEAR FOWLER FROM 0.7 KM SOUTH OF MERCED STREET UNDERCROSSING TO 0.5 KM NORTH OF CLOVIS AVENUE UNDERCROSSIN
WATKINS AND BORTOLUSSI, INC. ABOUZEDAN, RAAID  $743,009 08/27/07  64%
06-420314 77 LARKSPUR STREET 3240 N. MILLBROOK  $260,436 10/03/07
    $51,542 06/02/11  35%
FRESNO, CA 93726
   SAN RAFAEL, CA 94903  
     (559)243-3598  
PLANTING AND IRRIGATION
HA22 SWPPP
06-FRE-99-10.7/15.4 IN FRESNO COUNTY NEAR FRESNO FROM MERCED STREET UC TO CHESTNUT  AVENUE OC AND FROM HERNDON CANAL BR TO SAN JOAQUIN RIVER BRIDGE
MARTIN BROTHERS ABOUZEDAN, RAAID  $2,257,282 12/18/07  0%
06-0G6504 20 LIGHT SKY COURT 3240 N. MILLBROOK  $0 01/14/08  0%
    $0  
FRESNO, CA 93726  
   SACRAMENTO, CA 95828
     (559)243-3598 SUSPENDED
PLACE BONDED WEARING COURSE
HM WPCP
06-FRE-99-12.2/14.5 IN FRESNO COUNTY NEAR FOWLER FROM 0.2 KM SOUTH OF CLOVIS AVENUE UNDERCROSSING TO AMERICAN AVENUE OVERCROSSING
J. S. BRAR HADDADIN, HAIDAR  $472,025 01/31/05  32%
06-458604 2779 BULLARD AVENUE 3240 N. MILLBROOK  $424,422 02/14/05
 89%
ACST-P099-(482)E FRESNO, CA 93726  $0 09/15/09
  P0-99 4-(2ES)T CLOVIS, CA 93611  
(559)243-3599
6206- 005-() HIGHWAY PLANTING AND IRRIGATION    
SWPPP
HB4

State of California Department of Transportation
Page 3
 Statement of Ongoing Contracts as of  03/20/08
04/02/08
District 06
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message
06-FRE-99-22.2/0 IN FRESNO COUNTY IN FRESNO AT ROUTE 99/180 SEPARATION
DREAMBUILDER    $131,415 10/24/07  0%
06-0C0404 1361 E GARTEN DR    $0 12/17/07
    $0    0%
INSTALL CONCRETE BARRIER  
   PLACENTIA CA 92870  
   (714)646-3697    
HB1 WPCP
06-FRE-99-24.2/26.7 IN FRESNO COUNTY IN FRESNO FROM NORTH FRESNO UNDERCROSSING TO 0.1 KM NORTH OF ASHLAN AVENUE  OVERCROSSING
BELAIRE WEST LANDSCAPE, INC. SAMIMI, MOHAMMAD  $910,705 06/17/03  100%
06-453204 P.O. BOX 6270    $883,949 06/27/03  100%
    $0 02/23/07
   BUENA PARK, CA 90622    
PLANTING AND IRRIGATION
     (559)445-6727  
HB32 SWPPP
06-FRE-168-29.3/0 IN FRESNO COUNTY NEAR AUBERRY SANCHEZ GRADING MENGONI, MARK  $250 04/18/06  0%
06-0F8804 5070 N SIXTH ST., STE 176 505 N STREET  $0 05/24/06
CULVERT REPAIR/SLOPE STABILIZATION  0%
   FRESNO, CA 93721  $0 07/14/06
   FRESNO, CA 93710  
(559)445-5595
      
  
202.02
06-FRE-180-31.3/0 IN FRESNO COUNTY NEAR MENDOTA AT FOUR MILE SLOUGH BRIDGE
DAYLEN, INC ALLRED, LARRY  $96,384 12/19/02  100%
06-478904 1039 E. SANTA ANA 505 N STREET  $94,611 12/27/02
    $0 03/16/06  100%
MITIGATION PLANTING AND IRRIGATION FRESNO, CA 93723
   FRESNO  CA  93704  
     (559)445-5004 OVER RUN
HA22 WPCP
06-FRE-180-55.4/56.6 IN FRESNO COUNTY IN FRESNO AT VARIOUS LOCATIONS
WATKIN AND BORTOLUSSI INC FORSTER AND KROEGER LANDSCAPE MAINTENANCE INC A JOINT VENTURE
ALLRED, LARRY  $1,745,978 10/27/06  0%
06-342344 505 N STREET  $1,266,180 11/20/06  0%
STP-    -(   )  $16,183 05/03/10
HIGHWAY PLANTING AND IRRIGATION FRESNO CA 93721  
--()
   (559)445-5004 PLANT EST SATIS
77 LARKSPUR STREET
HE14 SWPPP
SAN RAFAEL CA 949014886
(415)453-4691
06-FRE-180-60.3/64 IN FRESNO COUNTY IN AND NEAR FRESNO FROM ROUTE 168 TO CLOVIS AVENUE
WATKIN & BORTOLUSSI INC./ FORSTER & KROEGER LANDSCAPE INC., A JOINT VENTURE
SAMIMI, MOHAMMAD  $3,801,515 11/22/06  0%
06-342444  $2,874,672 12/19/06
   3240 N. MILLBROOK  $41,440 04/06/11  0%
HIGHWAY PLANTING AND IRRIGATION FRESNO, CA 93726
    
77 LARKSPUR STREET (559)243-3814
   PLANT EST SATIS
SWPPP SAN RAFAEL, CA 94901
HE14
 

State of California Department of Transportation
Page 4
 Statement of Ongoing Contracts as of  03/20/08
04/02/08
District 06
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message
06-FRE-180-63.3/66.5 IN FRESNO COUNTY IN AND NEAR FRESNO FROM 0.2 KM EAST OF CLOVIS AVENUE OVERCROSSING TO 1.3 KM EAST OF TEMPERANCE AVENUE
SECURITY PAVING COMPANY, INC. OSCAR SHERRILL  $48,907,005 12/20/07  3%
06-342434 P.O. BOX 1489 3240 N. MILLBROOK  $790,049 01/08/08
    $678,081 10/06/09  2%
FRESNO, CA 93726-5866
   SUN VALLEY, CA  91353-1489  
     (559)243-3812  
CONSTRUCT FREEWAY AND BRIDGES
HE14 SWPPP
06-KER-5-3.0/3.6 IN KERN COUNTY NEAR LEBEC FROM 0.1 KM NORTH OF CRESSEY CATTLEPASS BRIDGE TO 0.7 KM SOUTH OF LEBEC  ROAD OVERCROSSING
CRUCO CONSTRUTION GROUP INC. 2443 FOUNDRY PARK AVE FRESNO, CA 93706
JIM BURFORD  $399,448 01/18/08  49%
06-418714 1824 NORRIS ROAD  $55,122 02/08/08  14%
    $33,325 04/24/08
   BAKERSFIELD, CA 93308  
2443 FOUNDRY PARK AVE
   (661)332-4208  
REMOVE BRAKE INSPECTION AREA
HB4N SWPPP FRESNO, CA 93706
 
06-KER-5-10.2/15.8 IN KERN COUNTY NEAR LEBEC FROM GRAPEVINE ROAD UNDERCROSSING TO ROUTE 5 AND 99 SEPARATION
PETERSON CHASE GENERAL ENGINEERING CONSTRUCTION INC.
HISHAM ALNATOUR  $2,575,140 08/15/07  20%
06-0E2304 1824 NORRIS ROAD  $5,375 09/17/07  0%
ACIM-005 -(179)E 1792 KAISER AVE BAKERSFIELD, CA 93308  $5,375 07/11/08
--()  
RESURFACE CONCRETE PAVEMENT (661)391-4747
   IRVINE, CA 92614-5706  
HA22 WPCP  
06-KER-5-62.0/82.5 IN KERN COUNTY NEAR LOST HILLS AND IN AND NEAR MCFARLAND
PROFESSIONAL CONSTRUCTION SERVICES
AMARJIT DHALIWAL  $586,765 12/10/07  0%
06-0G6204  $0 01/03/08
805 S. LEXINGTON ST.  0%
   REPLACE CONCRETE PANELS 3309 VINCENT RD. DELANO, CA 93215  $0 05/12/08
    
(661)720-0972
   PLEASANT HILL, CA 94523  
  WPCP  
06-KER-33-36.6/0 IN KERN COUNTY NEAR MCKITTRICK AT 3.7 KM NORTH OF ROUTE 58
BUGLER CONSTRUCTION PETER MULLALY  $317,920 09/26/07  0%
06-0F8204 47000 WARM SPRINGS BLVD 101 805 S. LEXINGTON ST.  $0 10/12/07
    $0    0%
EXTEND EXISTING BOX CULVERT DELANO, CA 93215  
   FREMONT, CA 94539