State of California Department of Transportation
Page 1
 Statement of Ongoing Contracts as of  04/20/08
05/01/08
District 08
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message

08-RIV-10-8.1/24.2 IN RIVERSIDE COUNTY IN AND NEAR BEAUMONT AND BANNING
ALL AMERICAN ASPHALT    $14,758,201 02/01/08  0%
08-1A9904 P O BOX 2229    $0 03/07/08
ACIM-0010-(100)9  $0    0%
CONSTRUCT BARRIERS  
--() CORONA CA 928782229  
   (951)736-7600    
HA27 SWPPP
08-RIV-10-27.6/27.6 2.5 MILES EAST OF ROUTE 111 JUNCTION NEAR PALM SPRINGS
RSB GROUP, INC. FATHI, ALI  $849,000 02/28/08  23%
08-0L5304 22600-G LAMBERT ST. #1405 2023 CHICAGO AVENUE, SUITE B-6
 $561,449 02/28/08  66%
ER-    -(   )  $0 04/30/08
--() RSP FOR THE CHANNEL BED TO ARMOR THE PIERS
LAKE FOREST, CA  92630  
RIVERSIDE, CA 92507
      
(951)232-7259
2010 201130
  
08-RIV-10-105.0/134.3 IN RIVERSIDE COUNTY IN AND NEAR DESERT CENTER FROM DESERT CENTER UNDERCROSSING TO 0.7 MILE WEST OF WILEYS WELL OVERCROSSING
FNF CONSTRUCTION INC    $3,926,690 03/07/08  0%
08-0G7004 115 SOUTH 48TH STREET    $0 04/16/08  0%
    $0  
   TEMPE AZ 85281    
   (480)784-2910    
RUBBERIZED HOT MIX ASPHALT OVERLAY
HM1 SWPPP
08-RIV-10-144.1/156.6 IN RIVERSIDE COUNTY IN BLYTHE FROM 0.1 MILE WEST OF WEIGH STATION TO THE COLORADO RIVER BRIDGE
GRANITE CONSTRUCTION COMPANY    $2,318,791 03/17/08  0%
08-0G7304 P O BOX 50085    $0 04/02/08
 0%
      $0  
   WATSONVILLE CA 95077  
PLACE RUBBERIZED HOT MIX ASPHALT  
   (831)724-1011  
SWPPP
HA22
08-RIV-15-8.2/23.9 IN RIVERSIDE COUNTY IN MURRIETA AND LAKE ELSINORE FROM 0.9 KM SOUTH OF ROUTE 15/215 SEPARATION TO 2.6 KM NORTH OF ROUTE 15/74 SEPA
ALL AMERICAN ASPHALT JAMES M. MC GEE PROJECT MANAGER
YANG, CHAD  $8,950,144 09/07/07  18%
08-495204  $2,572,393 10/05/07
ACIM-015 -(150)6 9225 STELLAR CT., STE B
 $0 03/23/09  29%
1776 ALL AMERICAN WAY  
--()
   CORONA, CA  91718-2229 CORONA, CA 92883  
GRIND AND REPLACE SLABS
HA22 WPCP   (951)232-7638
08-RIV-15-40.0/40.7 IN RIVERSIDE COUNTY IN CORONA FROM 0.5 KM SOUTH OF MAGNOLIA AVENUE OVERCROSSING TO 0.6 KM NORTH OF MAGNOLIA AVENUE OVERCROSSING
BEADOR CONSTRUCTION CO. INC. ABUGHARBIEH, IMAD  $13,264,892 11/21/07  15%
08-452204 26320 LESTER CIRCLE 9225 STELLER COURT STE B
 $2,601,422 12/13/07  20%
STPL-5104-(032)N  $0 11/27/09
 510-4 03-() CORONA, CA 92883  
CORONA, CA 92883
--()    
CONSTRUCT NEW RAMP AND WIDEN BRIDGE (951)232-3610
HE11 SWPPP

State of California Department of Transportation
Page 2
 Statement of Ongoing Contracts as of  04/20/08
05/01/08
District 08
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message
08-RIV-15-41.5/0 IN RIVERSIDE COUNTY IN CORONA AT NORTH ROUTE 15 TO WEST ROUTE 91 CONNECTOR OVERCROSSING AND AT TEMESCAL WASH BRIDGE OVERHEAD
J MC LOUGHLIN ENGINEERING CO. STEVE VAN DORN P.E. OPERATIONS MANAGER
YANG, CHAD  $1,128,639 09/17/07  65%
08-0E6804  $1,063,148 10/04/07
   9225 STELLER COURT SUITE B
 $0 05/06/08  97%
   10641 FULTON COURT CORONA, CA 92883  
    
BRIDGE DECK REHABILITATION (951)232-7638
HM3 WPCP RANCHO CUCAMONGA, CA  91730
 
08-RIV-60-.5/7.5 IN RIVERSIDE COUNTY AT GLEN AVON FROM ROUTE 15 AND 60 SEPARATION TO VALLEY WAY UNDERCROSSING
YEAGER SKANSKA INC.  MR. JON P. HADLEY
KAWWA, JABRA  $55,317,112 03/08/06  0%
08-354804 2023 CHICAGO AVENUE, SUITE B6
 $54,993,059 03/17/06
ACNH-P060-(123)E  $0 08/14/08  0%
1995 AGUA MANSA ROAD  
LN62-08 0-(8) WIDEN HIGHWAY RIVERSIDE, CA 92507
--() RIVERSIDE, CA 92509 PLANT EST SATIS
(951)276-1938
HB5 SWPPP  
08-RIV-71-/2.7 IN RIVERSIDE COUNTY NEAR CORONA AND CHINO HILLS FROM SAN BERNARDINO AND RIVERSIDE COUNTY LINE TO SANTA ANA RIVER BRIDGE
SEMA CONSTRUCTION YOGARAJAH, MANNY M.  $9,500,960 12/29/03  0%
08-446514 2 SOUTH POINTE DR. STE 295 790 S. VIA LATA STE 100
 $9,973,913 01/14/04  0%
HP21-6208-(007)L  $0 04/29/08
 620-8 00-() LAKE FOREST, CA  92630 04/29/08
COLTON, CA 92334
--()   PLANT EST SATIS
WIDEN DIVIDED HIGHWAY (951)830-6864
HE13 SWPPP
08-RIV-74-42.5/0 IN RIVERSIDE COUNTY IN HEMET FROM 0.1 MILE WEST OF DARTMOUTH STREET TO NEW CHICAGO AVENUE
DBX INC EBRAHAM, EBRAHAM  $219,452 08/10/07  97%
08-314704 42066 AVENIDA ALVARADO STE C 1110-A RESEARCH DRIVE  $224,515 09/07/07
 100%
   REDLANDS, CA 92374-4562  $0 04/18/08
   TEMECULA CA 92590 04/25/08
INSTALL TRAFFIC SIGNAL (951)232-6263
   (951)296-9909  
WPCP
HB4N
08-RIV-79-7.0/7.1 IN RIVERSIDE COUNTY NEAR AGUANGA AT TEMECULA CREEK BRIDGE
BERT W SALIS INC. MANASRAH, FATHI  $643,545 10/03/06  0%
08-450204 10769 WOODSIDE AVENUE, #205  $622,127 10/13/06
   9225 STELLAR COURT, SUITE B
 $0 12/23/08  0%
ROCK SLOPE PROTECTION  
   SANTEE, CA 92071
     CORONA, CA 92883 PLANT EST SATIS
HA21 SWPPP (951)277-8582
08-RIV-91-.6/1.2 IN RIVERSIDE COUNTY NEAR CORONA  FROM 1.0 KM EAST OF ORANGE AND RIVERSIDE COUNTY LINE TO 1.4 KM  WEST OF ROUTE 91 AND 71 SEPARATIO
SEMA CONSTRUCTION, INC. MANASRAH, FATHI  $13,622,638 02/08/07  51%
08-456614 6 ORCHARD SUITE 150 9225 STELLAR COURT #5  $9,437,038 02/27/07  69%
HP21-6054-(049)L  $0 04/17/09
 605-4 04-() LAKE FOREST, CA  92630 CORONA, CA 92883  
--()   (951)277-8582  
REPLACE EXISTING BRIDGE
HE11 SWPPP

State of California Department of Transportation
Page 3
 Statement of Ongoing Contracts as of  04/20/08
05/01/08
District 08
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message
08-RIV-91-5.3/6.6 IN RIVERSIDE COUNTY IN CORONA FROM 0.2 KM WEST OF LINCOLN AVENUE OVERCROSSING TO EAST GRAND BOULEVARD UNDERCROSSING
P AND D LANDSCAPE MANAGEMENT SERVICES
SPRAY, MICHAEL  $2,005,417 11/03/06  0%
08-474104  $1,758,481 12/05/06
   1110-A RESEARCH DR.  $0 12/24/10  0%
999 TOWN AND COUNTRY RD 4TH F REDLANDS, CA 92374-4562
    
   ORANGE CA 92868 (951)232-6497 PLANT EST SATIS
PLANTING AND IRRIGATION
HA25 SWPPP (714)835-4447
08-RIV-215-37.7/43.9 IN RIVERSIDE COUNTY IN RIVERSIDE AND MORENO VALLEY AT VARIOUS  LOCATIONS
WASHINGTON/OBAYASHI LOPEZ, JOE  $256,728,087 02/06/04  88%
08-334844 P.O. BOX 600 3474 NIKI WAY  $239,567,139 02/24/04  92%
ACNH-215 -(219)9  $0 08/08/08
I-215 -(219)9 WIDEN EXISTING FREEWAY HIGHLAND, CA  92346 RIVERSIDE, CA 92557  
ACNH-X065-(080)N   (909)275-0751  
HB5 HB4C HE11
SWPPP
08-RIV-243-.1/.6 IN RIVERSIDE COUNTY IN MOUNTAIN CENTER ON ROUTE 243 FROM 0.2 KM NORTH TO 1.18 KM NORTH OF ROUTE  243 AND 74 SEPARATION
GRAND PACIFIC CONTRACTORS INC FATHI, ALI  $543,965 08/03/07  63%
08-0C3404 11405 GEYSER DRIVE  $610,166 08/30/07
   2023 CHICAGO AVE. SUITE B-6
 $0 05/14/08  99%
   MIRA LOMA CA 91752  
RIVERSIDE, CA 92507
   WIDEN ROADBED (951)360-0952  
SWPPP (951)232-7259
HB1
08-RIV-243-13.3/29.7 IN RIVERSIDE COUNTY IN AND NEAR BANNING FROM 0.6 MILE SOUTH OF INDIAN HILL ROAD TO ROUTE 243/10 SEPARATION
GRAHAM CONTRACTORS INC    $747,941 03/14/08  0%
08-0J5904 P O BOX 26770    $0 04/15/08  0%
    $0  
   
   PLACE SEAL COAT SAN JOSE CA 95159
   (408)293-9516    
HM1 WPCP
08-RIV-243-13.8/13.9 IN RIVERSIDE COUNTY ABOUT 23.2 KM SOUTH OF BANNING AT INDIAN VISTA POINT
RSB GROUP INC. ATTN: SIMON SEPEHRI
VERLENGIA, ROMANO  $318,121 02/09/07  100%
08-0C4004 2781 W. RAMSEY STREET, STE #7
 $317,669 03/07/07  100%
   8 MCLAREN, SUITE #8  $0 07/03/07
    
UPGRADE INDIAN VISTA POINT BANNING, CA 92220
   IRVINE, CA   92318  
HB71 WPCP   (951)538-9810
08-SBD-10-22.3/30.1 IN SAN BERNARDINO COUNTY AT VARIOUS LOCATIONS IN COLTON AND REDLANDS
J MC LOUGHLIN ENGINEERING CO INC
LENART, ELVIRA  $799,469 08/28/07  100%
08-0E7304  $779,509 10/09/07
   3474 NIKI WAY  $0 03/25/08  100%
REHABILITATE BRIDGE DECKS 10641 FULTON COURT RIVERSIDE, CA 92507
   03/28/08
(951)840-8327
   RANCHO CUCAMONGA CA 91730 COMPLETED
HM3 WPCP (909)944-1037

State of California Department of Transportation
Page 4
 Statement of Ongoing Contracts as of  04/20/08
05/01/08
District 08
Location Awarded
Contract  Bid + CCOs Est Comp %Time
Storm Water
Plan
Resident
Engineer
Fed Aid Description  Comp To  date Approved % Work 
Pgm Code Type Of Work Contractor This Month Accepted Message
08-SBD-10-24.0/33.6 IN SAN BERNARDINO COUNTY IN COLTON, SAN BERNARDINO, LOMA LINDA AND REDLANDS AT VARIOUS LOCATIONS
TERNO, INC. OOI, KEE  $9,089,070 06/28/07  55%
08-384204 15701 HERENO AVENUE  $4,427,255 07/16/07
ACIM-X071-(052)E 790 VIA LATA, SUITE 100
 $0 10/06/08  48%
LN62-08 0-(2) WIDEN AND STRIPE RAMPS LA MIRADA, CA  90638 COLTON, CA 92324  
--()    
(951)840-8323
HB4N SWPPP
08-SBD-10-/39.1 IN SAN BERNARDINO AND RIVERSIDE COUNTIES AT VARIOUS LOCATIONS ON ROUTES 10,15,18,6066,71,83 AND 210
FREEWAY ELECTRIC STOKES, RAY  $1,200,000 10/30/07  100%
08-0L1304 5942 ACORN STREET 464 W. 4TH ST. 6TH FLR MS# M-1104
 $636,059 10/30/07  100%
    $0 04/04/08
   RIVERSIDE, CA  92504 04/10/08
REPLC SIGNS, RMV EXCESS SAND, CLEAN INLETS
SAN BERNARDINO, CA 92401-1400
     COMPLETED
201130    (951)232-3748
08-SBD-15-3.1/7.4 IN ONTARIO AND RANCHO CUCAMONGA FROM FOURTH STREET UC TO VICTORIA STREET UC
CALIFORNIA PROFESSIONAL ENGINEERING INC.
GADALLA, AMGAD  $685,000 01/29/08  40%
08-0L4404 15367 TAMARACK ROAD  $19,390 01/29/08
    $0 06/30/08  3%
9316 MABEL AVENUE VICTORVILLE, CA 92392  
   GRADE, COMPACT FILL SLOPES & PLACE AC DIKE
   SOUTH EL MONTE, CA  91733 (951)453-8929  
2010 201130
    
08-SBD-15-9.0/13.1 IN RANCHO CUCAMONGA FROM CHERRY AVENUE TO LYTLE CREEK BRIDGE
BEADOR CONSTRUCTION COMPANY GONZALEZ, ALFONSO  $865,000 04/02/08  0%
08-0L7604 26320 LESTER CIRCLE 15367 TAMARACK RD.  $0 04/08/08  0%
    $0 08/31/08
REMOVE & REPLACE CONCRETE PAVEMENT VICTORVILLE, CA 92392  
   CORONA, CA  92883
     (951)538-5218  
2080 010010
  
08-SBD-15-13.8/28.6 IN SAN BERNARDINO COUNTY ON ROUTE 15 FROM LYTLE CREEK BRIDGE TO OAK HILLS
BEADOR CONSTRUCTION COMPANY GONZALEZ, ALFONSO  $865,000 04/02/08  0%
08-0L7704 26320 LESTER CIRCLE 15367 TAMARACK RD.  $0